johnfarrugi
Member
OP
The pilot release is being controlled by cam relays on the press controller through my PLC. I have two inputs from the press, pilot release and steel feed. The pinch rollers are release when I recieve the signal from the press. The steel is fed when I recieve the other signal from the press. Feed angle and SPM are manually input from the operator.
Last edited: