GEO SCADA scheduling the polling data for multiple DNP3 outstations

Join Date
Dec 2013
Location
New Damietta city
Posts
34
Dear Experts,
Thanks in advance for your kind help.

I have a GEO SCADA expert 2022 and configure it as a DNP3 master, also I have multiple DNP3 outstations which are S7-1200.
My client asking me to make a schedule for data polling of each outstation, which means the SCADA server will poll each outstation data at a specific time of the day and all outstations will not communicate at same time of the day to the SCADA.
So, could you help me to execute this task by a smart way as I'm still not expert in GEO SCADA.
Thanks
 

Similar Topics

Dear Experts, I'm just started working with GEO SCADA and I need your valuable help. Currently, I'm trying to edit the alarm limits on MIMIC...
Replies
0
Views
212
Hi all, I am trying to bring in some alarm tags from a SCADApack plc to a Geo SCADA system. The system is existing and configured with working...
Replies
0
Views
1,900
Hi everyone, was hoping I could inquire with the community as I'm stuck in quite a bind. I have a Delta Tau PWM drive model number GPH1020000...
Replies
1
Views
1,489
Dear All, I need to configure the vijoe designer so that the Shneider HMI can communicate with Hot standby (redundant PLC), the communication...
Replies
10
Views
2,687
So I'm pretty new around here but I come looking for advice or suggestions to research. Im the plant electrician/SCADA guy for a warer department...
Replies
8
Views
198
Back
Top Bottom