Using NS10 touch screen. Using the graph function and saving it on a memeory card. Each graph is saved as batch01, batch02,.....
Unfortunately every time I download the screen program it starts saving at batch01 and overwrites the existing graph. How do you stop this. Is there a Memory word in the screen that holds the number? If I could choose the number it is saved with that would be ideal.
Thanks
Unfortunately every time I download the screen program it starts saving at batch01 and overwrites the existing graph. How do you stop this. Is there a Memory word in the screen that holds the number? If I could choose the number it is saved with that would be ideal.
Thanks