bigrthanur
Member
I am having a brain block about using control with only gain and reset If i was to set up my controller to work optimal. I would think i would want the controller to look at the error as much as possible. But i am trying to think back to basic process and forgot?
ANyway my question is i set my reset high(to look at the error more often) Wouldnt my controller lets say heat control in a water tank, Work better or more smoothly?
ANy info would help
Thanks
ANyway my question is i set my reset high(to look at the error more often) Wouldnt my controller lets say heat control in a water tank, Work better or more smoothly?
ANy info would help
Thanks