Hello all,
AD recomends a 2" clearence between a PLC and other devices/panel walls/doors. I am curious if their is an industry standard for amount of free space required. The panel will have a DL06 PLC, 150 VA step down transformer, two circuit breakers, two AB SMC-3 soft starts, 24 VDC power supply, two Signet Conductivity meters, 40 or so MBK terminal blocks, and various lights and switches mounted in the door.
Thanks for the help,
Micheal
AD recomends a 2" clearence between a PLC and other devices/panel walls/doors. I am curious if their is an industry standard for amount of free space required. The panel will have a DL06 PLC, 150 VA step down transformer, two circuit breakers, two AB SMC-3 soft starts, 24 VDC power supply, two Signet Conductivity meters, 40 or so MBK terminal blocks, and various lights and switches mounted in the door.