snaoum
Member
If I have a major fault I want to be able to clear that fault by cycling power to the PLC. I have a CF card and would like to load from it on power up so if there is a fault in the field the customer and cycle power and clear any faults that may have occured. How do I do this, Im going through the manual and I dont see any specifics on how to do this.