AGV load transfer

toone

Member
Join Date
Jul 2008
Location
goirle
Posts
6
For interfacing between an AGV system and the stationary system an optical datatransmission sensor for handshake during load transfer is used.
Both stationary and AGV system have a seperate emergency stop circuit. If an emergency stop is pushed this is signalled to the other system by dropping the handshake signals. Is this according CE regulation ? Are there any rules how to handle or can I see stationary and AGV as seperate systems ?
 

Similar Topics

I am getting ready to start an AGV project, and as part of this project I want to be able to basically configure recipes for different part #'s as...
Replies
1
Views
1,794
Hi everyone, I got assignment from my boss to develop AGV system using PLC programming. After surf by internet, I got info that i need to have ...
Replies
52
Views
22,683
Looking for some help in setting up a ControlLogix program to talk to an Egemin AGV using TCP? I am looking for some sample code to get me...
Replies
0
Views
2,008
im looking for a cheap way to log information using a PLC's on mobile agv's. I would like to know the arrival time(to the second) the agv's move...
Replies
0
Views
1,568
Back
Top Bottom