AssetCentre Scheduled Panelview 550 Upload failed

craigsimon

Member
Join Date
Apr 2002
Location
Minnesota
Posts
93
I am running AssetCentre CPR9 with 3 agents. All agents are loaded the same. I ran my first big scheduled backup and compare this last weekend. I had 7 schedules that ran a total of 2-PLC5, 2-CtrlLogix, 23-SLC504, 15- PV550. Each schedule has a combination of each asset and all the schedule's start times are offset from each other. The schedules are set to run over a total of 7 hours early AM on the weekend. All Assets passed and schedules all ran good with the exception of the PanelView550s. 9 out the 15 PVs failed. The error message was "Upload Failed". Each PV was set to try 5 times and they all ran on all the agents with the same failure.

Our network is setup to run through a CtrlLogix gateway and all the processors and PV are on the DH+ network.
Any ideas???

Thanks
 

Similar Topics

AssetCentre Client loads correctly on the server, but when going through another machine the client never presents a splash screen; however, it...
Replies
1
Views
156
Hello Everyone- I'm working on a new network deployment of AssetCentre and I am not able to authenticate with the application using our...
Replies
1
Views
410
I upgraded Factorytalk activation manager to version 5.01 from 5.00 and since then, Factorytalk Assetcentre stopped working! I receive the...
Replies
1
Views
478
Hi All. Our site has AssetCentre v11.0 to track audit trails for PanelView Plus HMIs on the floor. Does AssetCentre v11.0 require any minimum...
Replies
1
Views
1,514
Hello everyone! The case is that I have 8 computers connected on the same network and directory. One of the computers is the FactoryTalk...
Replies
1
Views
1,730
Back
Top Bottom