BudW
Member
All,
I am working on a quote for a test fixture that will be located in a Class 1, Division 1 area. Our part of the quote is for the End Of Arm section of what looks like a pick and place unit. The EOA will have a few proximity switches on it. These NAMUR style proximity switches and intrinsically safe barriers will be supplied by others. The proximity switches will be located in the Class 1, Division 1 location. The intrinsically safe barriers will be located in the main enclosure and in a safe area. The proximity switches have a quick disconnect and is using a hazardous NAMUR location cordset. The proximity cables will be pulled into a junction box enclosure and then on into the main enclosure.
Q. Do I still need a Class 1, Division 1 enclosure & cord grips for the proximity cables??
Q. Can you suggest a manufacture & series of Class 1, Division 1 cord grips?
Thank you in advance.
Bud
I am working on a quote for a test fixture that will be located in a Class 1, Division 1 area. Our part of the quote is for the End Of Arm section of what looks like a pick and place unit. The EOA will have a few proximity switches on it. These NAMUR style proximity switches and intrinsically safe barriers will be supplied by others. The proximity switches will be located in the Class 1, Division 1 location. The intrinsically safe barriers will be located in the main enclosure and in a safe area. The proximity switches have a quick disconnect and is using a hazardous NAMUR location cordset. The proximity cables will be pulled into a junction box enclosure and then on into the main enclosure.
Q. Do I still need a Class 1, Division 1 enclosure & cord grips for the proximity cables??
Q. Can you suggest a manufacture & series of Class 1, Division 1 cord grips?
Thank you in advance.
Bud
Last edited: