dbh6
Lifetime Supporting Member
Hey guys,
So im currently programming a sequences for my pump logic for a project. I have tested the program and so far its "full proof". However i am aware of the infamous "Go to Run" Conditions (courtesy to Ron Beaufort) such that if the PLC's losses its power, if some operator, switch the mode of the plc from run to remote, or from run to program then run, etc.
So i currently have a 1756-L62 5562 control logix plc which iam testing this on, and im trying all possible scenario's. so let me know what you guys think of other ways to test the "Go To Run" conditions.
So im currently programming a sequences for my pump logic for a project. I have tested the program and so far its "full proof". However i am aware of the infamous "Go to Run" Conditions (courtesy to Ron Beaufort) such that if the PLC's losses its power, if some operator, switch the mode of the plc from run to remote, or from run to program then run, etc.
So i currently have a 1756-L62 5562 control logix plc which iam testing this on, and im trying all possible scenario's. so let me know what you guys think of other ways to test the "Go To Run" conditions.