JDCROCKETT724
Member
I am using Graph for controlling 4 pallet stops. I am also using the supervision control on the last step that makes sure the pallet reached it's destination before the step time exceeds the expected travel time. Each pallet stop is on it's own simultaneous branch.
My problem is that when the supervision goes red for a particular pallet on a simultaneous branch then all my other simultaneous branches stop transitioning to the next step. But I want my other branches to keep working despite one of my branches having a supervision error. Is this something graph can do?
My problem is that when the supervision goes red for a particular pallet on a simultaneous branch then all my other simultaneous branches stop transitioning to the next step. But I want my other branches to keep working despite one of my branches having a supervision error. Is this something graph can do?