No matter, the replacement PLC will have amazing features like "space for future expansion", "trunking" and "drawings"!
Those are going to be huge cabinets if you make room for 5 extra racks than the designer intended
No matter, the replacement PLC will have amazing features like "space for future expansion", "trunking" and "drawings"!
Looks like a problem one can solve the same way one solves the problem of an overheating computer:
Add more fans.
Heres one I found the other day, I think the techs think they are saving time by just plugging cordset wires in and walking away when doing a replacement.....and no need to replace duct covers, or zipties that were cut...etc....etc.
-Dave
In my corner of the world these types of techs are called "Fitters" and they are usually to dumb to read the drawing or look at the wire numbers, so they follow the cable, pulling off all the trunking lid.Take the simple approach> Fire a couple of the worst offenders and the rest will shape up. Works well for me.
Thanks, Jeff...Eric I did one if those a year or so ago and i just used the a USB cable
Recently received a brand new small machine into the shop. The main panel was quite neat and clean, but when I opened the consolet for the operator control panel, I found this mess. Someone doesn't seem to take pride in their work...
On a related note, I want to backup the program in this PV C600 (2711C-T6M). Can I use a standard USB-A to mini-B cable, or is the 2711C-CBL-UU02 'special'?
-Eric